Gamuda IBS’ Way of Precast Wall To Wall Connection
Gamuda IBS is a well-known precast manufacturer in Malaysia. Being one of the key clients of Halfen Moment, Gamuda IBS has been collaborated with us, using our innovative building solutions in many of their prestigious projects. MOMENT Multi Loop Box is one of the latest product being implemented for precast wall to wall connection.

With the ongoing close partnership with Gamuda IBS, Halfen Moment had the opportunity to conduct demonstrations at their precast yard to showcase the application of Multi Loop Box for precast wall to wall connection. After rounds of testing based on different possible applications, Gamuda IBS engineers were satisfied and confident with Multi Loop Box advantages as follows:
- The long multi loop box version creates a perfect alignment to wall panels, acts as a shear key and simplify the design of the formwork.
- The magnet option provides easy installation onto the formwork.
- Able to customize the number of wire loops and length of steel box to match the height of the wall.
In the own words of the Head of Technical of Gamuda, Thoo Hoi Hian, and Engineer Steven Goh Nai Jun, “I would highly recommend this loop box to other engineers. Not just because of the quality of the product but the easy installation which makes wall to wall connection 50% faster when compared to traditional method, helping us to save our labour and time cost.”
With the positive response received from Gamuda IBS, more drawings with Multi Loop Box have already been incorporated into the precast design of their future projects.
Easy Installation Saving More Time & Cost
1. Multi Loop Box is attached to the formwork using magnets before the panel is casted.

2. After removing the formwork, the protective tape is removed, and the loop can be then be bent to the operating position.

3. The wire loops are bent out and straightened with a hammer claw.

4. Lastly, insert the reinforcement bar and concrete grout is poured into the joint shown below.


Still Using The Traditional Way To Connect Walls?
Let Us Drop You A Call For Consultation. For Free.
Related Articles You May Be Interested
Global Partnership Renewal With Samsung C&T
Upon our recent Global Partnership Renewal with Samsung C&T Corporation on September 2019, Halfen Moment has been invited to visit Samsung’s office in Seoul, South Korea.
Led by Halfen Moment Singapore Managing Director, Gary Connah, the visit further promotes our new innovative building products for future collaboration in 2020.


Over the years, Samsung C&T has successfully clinched many iconic projects; Biopolis Science Hub Phase 1, One Marina Boulevard, Harbourfront Twin Towers, Deep Tunnel Sewage System T-04, Changi East Reclamation, and Power Seraya Combined Cycled Power Plants.

The representative from Samsung C&T visited Halfen Moment office in Singapore last year to officially signed the Global Partnership Agreement. By collaborating with one of the biggest players in Asia, we can build a brighter and promising future in the construction industry.
The Secret Of Precast Wall To Wall Connection

There are a number of challenges when connecting precast walls, namely:
1. Connections are wet, so require temporary bracing.
2. Installation time can be lengthy, so crane time is not optimised.
3. Connecting of both vertical and horizontal rebar connections is practically impossible due to the stiffness of the rebars.
At Leviat, we have a solution for all of these challenges, but here we would like to address the third one as it is arguably the most important fundamental.
So What is MOMENT Loop Box?
MOMENT Loop Box are used for connecting precast wall to wall or to a column. After casting to the formwork, the precaster will just need to remove the tape and release the loop into the operating position. A vertical rebar (sometimes called a trimmer or cottering bar) is installed into the joint through the wire loops. Lastly, cementitious grout is poured or pumped into the joint.
There are 3 types of MOMENT Loop Box – Multi, Double and Single Loop Box.

Loop boxes are installed to the formwork according to the spacing specified by the designer, before the panel is cast.

A vertical rebar is installed into a joint through the wire loops of both precast panels before grouting.
Key Advantages
Fully compliant with EN1992-1-1 (Eurocode 2), MOMENT Loop Box has been tested in accredited test labs to simulate performance in various application, transmitting forces from three directions (perpendicular, parallel and transverse load).
Below are the key advantages of loop box when compared with the traditional method of connecting precast walls:
- Flexible installation method for seamless connection between precast wall
- Reduces the total installation time by 50% with less labour
- Eliminates the clashes between U-bars from the traditional method
- Customizable length of steel box and wire loops
- Easy installation of loop box to the formwork with the option of magnet

Multi loop box acts as a shear key and simplifies the design of the formwork.

Making precast wall connection easier and faster
Key Features
Consists of high-strength, galvanized steel casing and wire loops, loop boxes connect precast walls in an efficient and time saving method. Below are the key features of loop box:
Galvanized Steel Box
A robust sheet-steel box and wire loops contain the plastic latch and wire loops
Plastic Latch
Specially designed plastic latch to secure the wire loops in position for good anchorage embedment for in concrete

Flexible wire loops
Galvanized wire loops transmit force into the concrete and connect 2 walls to each other. Loops can be bent out and straightened with a hammer claw, screwdriver or a nail.
MOMENT Loop Box Makes Wall Connection Easier.
Let Us Drop You A Call For Consultation. For Free.
Related Articles You May Be Interested
Precast Connections You Must Know In 2024
Structural Connections For Precast Concrete Buildings
There are a number of ways of doing this such as via:
• Grouted Coupler for precasts walls and columns to foundations connection
• Wire Loop Box for precast walls connection
• Precast Coupler for precast elements connection
• Dowel Systems for precast beam to column connection
Apply the latest technology of precast connections from Leviat, available in Malaysia, Singapore, India & the Philippines. Discover more now!
MOMENT Grout Coupler


MOMENT Loop Box
They are usually used to connect 2 adjacent precast panels together, where the interlocking rebar and wire loops provides robustness in the event of an Earthquake to ensure that grout degradation would not result in complete collapse.
MOMENT Connection Loop
In order to connect 2 precast elements, both precast elements has to be cast with the MOMENT Connection Loop at the wall. A rebar will then be inserted through the intersection of 2 loops. After placing the rebar, the gap between the precast elements will need to be grouted using a 40Mpa or 70MPa non shrink grout depending on the application. Material strength of the MOMENT Connection Loop is 1770N/mm and complies to EN12385-4:2002+A1.

HEK Precast Coupler
Cast-in DEMU Fixing anchors i.e. T-FIXX®, bolt or bar anchors transfer the tension and shear force into the precast element.
The main advantage of the system is the fast and efficient positioning of precast elements. The connection can be subjected to load immediately after installation. This results in a substantial improvement in construction time.


Invisible Connections
But by keeping the grouting to a minimum, one such technology – Invisible Connections – has revolutionized the use of precast all throughout Northern Europe; it is a patented system, with its origins in Norway, to connect precast concrete without use of corbels or steel angles, and is used extensively throughout Europe due to the independently tested and certified European Technical Approval (ETA [4]) that provides engineers with peace of mind about the capacities.
The product range of Invisible Connections consists mainly of TSS Telescopic Stair Connectors & BSF Telescopic Beam Connectors.

Another topic relating to Invisible Connections will be covered as a future topic in our Academy site.
There are many good technologies available, but a dependence on local testing and local reference projects will hinder and slow down their introduction. An increased readiness to accept the certification schemes for prequalification that exist overseas such as ETA[4] and ICC certification where appropriate, will mean that the technologies can help keep pace with the requirements of the precast industry.
Stop Compromising on Quality.
Let Us Drop You A Call For Consultation. For Free.
Related Articles You May Be Interested
Proud Titanium Sponsor for SCI 2019
Halfen Moment is a proud titanium sponsor for Singapore Concrete Institute (SCI) 2019 held at Swissôtel The Stamford, Singapore. The annual event gathers multiple companies for a fun and enjoyable evening between Halfen Moment and all the affiliated guests.

Pre-dinner networking and product introduction session by Technical Manager, Mr KC Loh (left) and Halfen Moment Group Managing Director, Mr Rob Van Haaren (middle) with a guest.

SCI 2019 was officiated by the Director of HDB’s Centre of Excellence for Environmental Sustainability Research, Mr Tan Sze Tiong and welcoming speech by Halfen Moment Sales & Marketing Director, Ms June Ng.
The event was initiated with a speeches followed by a mini game, award presentation, stage games and magic show with aims to further connect representatives from all the companies present.

At Halfen Moment, we focus on building relationships, business, and community in the construction industry, upholding standards of excellence in the use of concrete and precast technology. To all the other entities, hope we can see each other in the next events and projects in 2020 and congratulation to all the committees for making the event a success.
Follow our social media (LinkedIn, Facebook, YouTube and Instagram) and stay tuned for more events and happenings from Halfen Moment.
Innovative Shortcut For Precast Connections
Developer: Micron Technology Micron Technology’s new centre of excellence for SSD Assembly and Test is located in Batu Kawan Industrial Park, Penang, Malaysia. This new facility development is located on a 52.6-acre site which represents an investment of US$356.6 million (RM1.5 billion) over five years. The Problem: The conventional method of lapping long rebars according to Eurocode standards has caused inconveniences on site. Handling long lapped lengths of rebars protruding from precast beams and columns is very tedious. Not to mention that the long starter bars are very dangerous to be installed which has alarmed safety concerns from the site management. After understanding the pain points of our client, instead of using the conventional method which involves corrugated duct and long lapping of rebars, we proposed the solution of using MOMENT Grout Coupler to connect precast beams & columns. With the application of the MOMENT Grout Coupler, our client was able to reduce 60 to 70% of the rebar lapping length with this rebar coupler system, saving more rebars and also reduce the installation time. Moreover, when the length of the long rebar was reduced significantly, the site safety factor has been improved as well. Besides, the advantage of the MOMENT Grout Coupler as a transitional coupler gave more flexibility to our client as the rebar sizes vary from level to level on site. Lastly, the rough surface of the coupler’s body managed to provide a strong bonding between the coupler and the concrete. Our client was very happy with the quality of the supplied MOMENT Grout Coupler, especially when barbreak system was achieved when testing was conducted. Overall, the usage of MOMENT Grout Coupler has made our client’s life much easier, not only to the precasters but also to the contractors from Micron’s project. Nonetheless, the time saving from connecting precast beams and columns has improved our client’s productivity, with fewer workers needed.
Client: JEKS Group
Product Supplied: MOMENT Grout CouplerProject Description

Long rebar lap length caused long installation time on-site along with safety concernThe Solution

MOMENT Grout Coupler The Result

Once filled with grout, bracing around the element can be removed after 3 daysFill In The Contact Form & Let Us Drop You A Call For A Free Consultation!
Related Articles You May Be Interested
Enhancing Construction Accessories Research With University Malaya
Amazing time at University of Malaya, where Halfen Moment signed a MoA with the World’s 15th Best Engineering Faculty of UM. The cooperation will focus on R&D of new building technologies and building talent capacity in the civil engineering area.


A big industrial player like Halfen Moment working closely together with the University fits exactly in one of the core values – Teamwork – of our company which was expressed in the speech of Rob van Haaren – Managing Director of Halfen Moment Group as well during the ceremony. This cooperation is a long term journey and will raise the bar, not only for students but as well as the building community.

The MOU was signed by Rob Van Haaren and Datuk Ir. (Dr.) Abdul Rahim Hashim – Vice Chancellor, University of Malaya signed on behalf of University Malaya. With this MoA, we look forward for more important engineering discoveries and technological breakthroughs.

Before the ceremony ended, KC Loh – Technical Manager of Halfen Moment took advantage of this opportunity to introduce our products and services to Datuk Ir. (Dr.) Abdul Rahim Hashim in accordance to Moment values of Ownership.
Construction is becoming more and more a dynamic and challenging industry, this collaboration provides us with unlimited opportunities and driving force behind our strategy for innovation. Building on the knowledge and research from University Malaya’s graduates and postgraduates, we hope to provide the building industry with new and better solutions in order to speed up efficiency in construction.
Welcome Hume Concrete!
Hume Concrete is one of the largest manufacturer of precast concrete products in Malaysia. We at Halfen Moment welcomed 20 Hume Concrete’s employees for a half day visit at our factory, which gave them the opportunity to have a detailed tour around the state-of-the-art headquarters of the Halfen Moment Group.

With our professional engineers, the sessions started with product briefing led by Gary Connah – Halfen Moment Singapore’s Managing Director and a factory visit led by KC Loh – Technical Manager.

The factory visit included an exclusive guided tour around our office and factory, the group has the opportunity to observed the process of rebar threading, duct manufacturing and understanding the wide range of our innovative construction accessories portfolio.

Among our representatives include, Rob Van Haaren – Halfen Moment Group’s Managing Director, June Ng – Sales & Marketing Director and Hafiz Othman – Design Engineer.
This factory visit is yet another opportunity for Hume Concrete to become first hand witnesses of the cutting-edge manufacturing process and stringent quality controls practiced, which will give them the confidence to build their future success with Halfen Moment. It was an enriching and knowledgeable experience where we discussed how our new products provides the endless possibilities for the precast concrete structure.
One of the core values of the Halfen Moment group is Teamwork. Not only internally but especially with stakeholders, government bodies and clients. Many thanks to our Engineering team for leading this motivating experience and welcome to the future of construction accessories!
Interested to learn more about our products, services or visit to our company? Contact our representatives for a personalized agenda!
Proud Gold Sponsor Of IESN 2019
Halfen Moment is the Gold Sponsor of International Engineering Students’ Night (IESN) 2019, an annual event initiated by the Engineering Faculty of University Malaya to develop bonding between international students and also aims to introduce the multinational engineering companies to the students.

Our Technical Manager, KC Loh, delivering his speech, connecting young engineers on behalf of Halfen Moment.

The event was kicked off by performances from the international students, continued with speeches from esteemed guests and country ambassadors. Interactive sessions were held during the evening to exchange ideas between local and international students.

On behalf of Halfen Moment, we wish all the best to the engineering students of University Malaya. We hope to see more innovative engineers in the near future that will provide the building and construction industry with new and better solution.
Feel free to contact us if you would like to explore any possible collaboration! We look forward to meet you in our next event! Stay tune!
Your Only Rebar Coupler For Precast Connections
The connection between precast concrete is a safety critical component in today’s structural precast construction. The success of this construction method goes beyond the structural performance of precast beams and columns; it also includes the performance of the precast connection. For the connection, the performance is not only limited to the structural robustness, but also embodies simplicity and productivity during the erection process. The connection types employed will not only affect the construction cost and speed but also have an impact on the sections that can be used via the ability for forces and moments to be redistributed throughout the finished structure. Moment Grout Coupler, consists of a one piece design, is a rebar coupler designed for precast connections. Compliant with ISO 15835, each grout coupler combines the benefits of the Moment JT threaded system and will achieve barbreak when used together with Moment’s proprietary 100MPa grout.* Specifically for precast connections, Grout Coupler can be used for connecting precast walls, columns, beams either horizontally or vertically. The most popular connections used with Grout Coupler are: For this type of connection, the high tensile steel starter bars are left protruding from the foundation. After that, a precast column with vertical sleeves at the end is placed over the starter bars. The sleeves are the filled in with grout to provide a connection. This connection has the ability to provide moment resistance at the connection between column end to footing. Additional technologies such as precast shoes can then be used to eliminate the need for propping. Similar to the above application, this enables the launching of one column section on top of another one whilst providing full moment continuity across the joint. This is specifically important on projects with large column sections as the height of the element is often limited to less than 1 storey because of crane capacity limits. You can use grout couplers to overcome one of the biggest challenges in precast concrete construction; a moment resisting frame. In this application, you provide clearance holes through the precast column and use a grouted coupler to provide full continuity through the precast column. To broaden the field of application, two product types are available: Full Grout Coupler and Half Grout Coupler. The rebars used with a Full Grout Coupler require no bar end preparation, such as threading, and are simply inserted to meet at the nominal centre point of the coupler. For more information on Moment Grout Coupler, please contact our offices where we can showcase you the actual Grout Coupler as well as our latest innovative precast accessories. *Lower grout grades might be possible, but it depends on the rib profile of the individual rebar supplier.Ideal Coupler For Precast Connections
1. Precast Concrete Column To Foundation Connection

2. Precast Column To Column Connection

3. Precast Beam To Column Connection

Connect Precast Elements The Easy Way.