Moment JT Couplers installed in bored pile foundation

Project: Jakarta Annex Centre Phase 1

Contractor: PT Bauer Pratama Indonesia

Product Supplied: Moment JT Coupler  

Project Description

Located in a seismic zone, the Jakarta Annex Centre Phase 1 is a landmark development in Indonesia requiring strict compliance with international structural safety standards. The bored pile foundation system demanded mechanical splices that could not only perform reliably under dynamic loads, but also speed up installation on a high-volume site. To meet these challenges, Leviat supplied over 20,000 units of Moment JT Couplers (size 32) for use with Grade 520 rebar.

Technology in Action

The JT Coupler was selected for its proven seismic performance and ease of installation. The project used the Type B Coupler, which allows the coupler itself to rotate during assembly, ideal for complex or confined construction environments where rebar cannot be turned. Designed with installation speed and safety in mind, this coupler offers:

  • Simple and fast installation process
  • A stronger mechanical connection with less steel
  • Comply to BS8110 and EN 1992-1-1:2004 (Eurocode 2)

Why Choose Moment JT Couplers for Seismic Zones?

Seismic performance was a critical factor for this project. JT Couplers are tested and certified to meet the most stringent international seismic codes, giving engineers and contractors complete confidence in their application:

ISO 15835-2 – The global benchmark for mechanical splices used in seismic zones

NF A 35-020 – One of the most demanding international product standards for rebar couplers in earthquake-prone environments

The couplers undergo rigorous alternating tension and compression tests under large strains, simulating real earthquake loading conditions. This ensures that the structural connection remains intact even under extreme seismic stress.

Comprehensive Support

Leviat provided more than just couplers, we also ensured on-time delivery, technical advice, and design collaboration with the project team. Our local support from our client, PT Bauer Pratama Indonesia also helped streamline on-site threading processes and ensure installation proceeded without delays. This project highlights the strength of our partnership, and Leviat is proud to have played a key role in its success.  

Local team preparing rebar threading to exacting standards using portable threading machine

End Results

With Moment JT Couplers, the Jakarta Annex Centre Phase 1 was able to:

  • Achieve high structural integrity in seismic foundations
  • Maintain a smooth and fast-paced site installation process
  • Receive proactive and responsive support from the Leviat team

Installed JT Couplers ensuring consistent and high strength splicing on site

 

 

Related Articles You May Be Interested